Full Time
540
TBD
Apr 5, 2023
Task:
A sign permit is required to place a temporary or permanent sign on a parcel of land, a building, a structure, or a place of business in any city. But before acquiring a sign permit, we need to check the sign code if the signage meets the city's standards. Sign regulations are based on the zoning of the property where the sign is
Figure out the following:
1. Parcel number of the address
2. Size (in acres) of the property
3. Taxpayer name and address
4. Which zoning do they belong
5. What is the maximum size and quantity allowed in that zone
6. Link for the sign code (website link)
7. Does our sign meet their sign code?
8. If so, Look for the application form for a sign permit and prepare paperwork for acquiring the permit for this sign.
The sign that our company wants to install can be found using this link:
This job requires a good comprehension of numbers and mathematics as well as the ability to conduct comprehensive research.
Go through the above test yourself and create all the necessary paperwork for acquiring a permit.
Let me know if you have any questions.
I'll keep everyone updated on the hiring process, but so far so good, I'm excited to be hiring another administrator.